Projects

Müselbacher Strasse

Geotechnical assessment, Underground investigation

Project:

The underground investigation includes an inspection of the affected sections of the L25, as well as an engineering geological detailed mapping of the entire slope area. Based on the results of the mapping, an underground exploration program was developed.

Services of 3G:

  • Basic survey and research
  • Field mapping of the route section
  • Development of an exploration program
  • Call for tenders and offer processing of the research work
  • Specialist-specific supervision of the exploration work
  • Preparation of a geological-geotechnical report

Location: Müselbacher Straße, Langenegg

Project Period: May 2018

3G GRUPPE GEOTECHNIK GRAZ ZT GMBH | Triester Straße 478a | 8055 Graz – Seiersberg-Pirka | Austria | T: +43/316/337799 | office[a]3g.at |

Branch office Vorarlberg | Hintere Achmühlerstraße 1a | 6850 Dornbirn | Austria | T: +43/5572/200649 | vorarlberg[a]3g.at |

Imprint | Privacy