The central task of the mobility concept for Bad Gastein is to connect the town center with the railway station square.
In the course of the feasibility study, an assessment of the geological and hydrogeological conditions of the project area was carried out.
An optimization of the route in terms of position and height was carried out based on the following aspects:
The required cross-sections were determined on the basis of the dimensions of the installations, the escape route and fire protection regulations as well as the geotechnical requirements, taking the driving method into account.
In order to provide an overview of the legal basis, all laws, regulations, guidelines, standards and recommendations relevant to the project were compiled quoted. In the course of the monetary and time schedule investigation of the feasibility, a forecast of the cost target, based on cost parameters according to the ÖGG guideline, as well as a forecast of the time schedule for two execution options was determined.
Location: Bad Gastein, Salzburg
Project Period: June to December 2018